Chapter 5: Power Up and Initial ChecksChapter 5: Power Up and Initial Checks (Rev. 8/98)Page 5-1
5.1 Before Powering OnWARNING:Follow Lockout/Tagout and other safety precautions when connecting ordisconnecting cabling, wiring, and equipmen
5.2 Initial Data SettingAfter completion of the System verification/power on procedure in Section 5.1, the System isready for the input of dat
4. Verify operation of manual start.P Press the START button on the Main operator panel and verify that all tools run in thecorrect direction